Buyer tools

Procurement templates, checklists and an Incoterms summary

Practical working documents for international purchasing: the information a supplier needs before it can quote accurately, what to verify about a supplier before comparing prices, and what to settle before an international order is placed. Nothing here is gated and nothing requires an account. Use them with any supplier — including us.

01Templates

RFQ template

A single-sheet request for quotation covering the information a supplier needs before it can price a line accurately.

LineDescriptionSpecification / standardMaterialDimension / ratingBrand or equivalent acceptedQuantityUnitRequired certificationDelivery place (Incoterm)Required delivery dateNotes
1Ductile iron gate valve, flangedEN 1074-2, PN16Ductile iron GGG50, EPDM seatDN200Equivalent accepted40pcsEN 10204 3.1 material certificateCFR Nouakchott2026-11-30Potable water service
  • State whether an equivalent brand is accepted — this single field changes both price and lead time.
  • Give the Incoterm and named place, not just the country.
  • If a specification is unknown, leave it blank rather than guessing; it will be raised as a clarification.

BOQ / project list template

For project requirements with many lines across several categories, in a structure that can be imported directly into the REPONS Deal Desk.

LineSection / disciplineDescriptionSpecificationStandardMaterialDimensionsQuantityUnitBrand requirementCertificationCustomer notes
1Water networkHDPE pipe PE100SDR17, PN10ISO 4427PE100OD 250 mm3000mEquivalent acceptedPotable water conformityCoil or 12 m lengths both acceptable
  • Keep one product per line — merged lines cannot be quoted or compared.
  • Keep the section column: it keeps a multi-discipline project readable during comparison.
  • Send the original BOQ as well; the template is for handling, not a replacement for your document.

MRO list template

For recurring maintenance, repair and operations requirements where part numbers and equipment context matter more than long descriptions.

LineEquipment / systemPart number (OEM)DescriptionManufacturerOEM or aftermarket acceptedQuantityUnitAnnual usage (if known)CriticalityNotes
1Crusher lubrication unitSKF 22220 EKSpherical roller bearingSKFOEM only8pcs24Critical — production stopHeld as site stock
  • Mark criticality: it determines whether air freight or a partial shipment is worth the cost.
  • Annual usage lets suppliers price a frame agreement instead of a one-off order.
  • State OEM-only lines explicitly; aftermarket equivalents are otherwise offered by default.
02Checklists

Supplier evaluation checklist

What to confirm about a supplier before comparing its price with anyone else's.

Legal identity
Registered company name, registration number and trading address — not only a website and a mobile number.
Role in the chain
Manufacturer, authorised distributor, trader or agent. This determines warranty, documentation and price stability.
Product evidence
Catalogues, datasheets and test or conformity documents for the exact item offered, not for the range.
Production or stock capacity
Whether the quantity is in stock, in production, or dependent on a new production slot.
Export experience
Prior shipments to your destination or region, and who prepares the export documents.
Documentation capability
Certificate of origin, conformity, inspection and any destination-specific document, confirmed before ordering.
Commercial terms
Incoterm, payment terms, validity, packing, warranty and lead time in writing.
Responsiveness
Time to acknowledge, time to quote and quality of technical answers — an early and reliable indicator.
After-sales
Spare-parts availability, technical support and how a claim would be handled.

Vendor qualification checklist

The document set most institutional and industrial buyers request when registering a new vendor.

Company registration
Trade registry extract or equivalent incorporation document.
Tax registration
Tax identification and, where applicable, VAT registration.
Bank details
Bank letter confirming account details in the company name.
Company profile
Activities, categories supplied, sourcing origins and contact structure.
Category capability statement
The specific categories being registered for, not a generic list of everything.
Quality approach
How specification compliance, inspection and documentation are handled per order.
Compliance declarations
Anti-bribery, sanctions and conflict-of-interest declarations where requested.
Insurance
Any insurance the buyer's registration portal requires.
Signed forms
The buyer's own vendor forms, completed exactly as issued — incomplete forms are the most common rejection reason.

International procurement checklist

What to settle before an international order is placed, in the order it usually causes problems.

Specification is frozen
Every line has a specification or an accepted deviation recorded in writing.
Incoterm and named place
For example DAP Nouakchott, Mauritania — Incoterms 2020. Country alone is not an Incoterm.
Destination requirements
Import documentation, conformity assessment, labelling and language requirements confirmed.
Packing
Export packing, marking, palletisation and container suitability agreed with the supplier.
Inspection
Whether inspection is document review, pre-shipment, factory or third-party — decided before production ends.
Documents
Invoice, packing list, certificate of origin, transport document and any certificate named in the order.
Payment
Terms, milestones and the banking route agreed before production begins.
Delivery plan
Ready date, consolidation point, booking and destination handling, with an owner for each step.
Validity
Offer validity and price basis checked against the actual order date.

Project procurement checklist

For BOQ-driven project supply where several disciplines and suppliers must arrive coherently.

Complete scope list
All disciplines captured in one list, so nothing is ordered late at a premium.
Technical review before sourcing
Missing specifications raised as clarifications instead of assumed.
Grouping strategy
Lines grouped by category and origin so each group reaches the right supplier type.
Site sequencing
Required-on-site dates per section, which drives what can share a shipment.
Consolidation plan
Which suppliers consolidate into which shipment, and which line sets the ready date.
Single comparable offer
One coordinated quotation rather than several unaligned supplier offers.
Document control
Technical submittals and approvals tracked per line where the client requires approval.
Change handling
A defined route for scope changes, with price and delivery impact stated before acceptance.
03Incoterms 2020 summary

Where cost and risk change hands

An Incoterm defines who arranges transport, who carries the risk and at which point it passes. Always write the rule with a named place and the edition — for example DAP Nouakchott, Mauritania — Incoterms 2020. The summary below is a working reference; the published ICC rules remain the authority.

RuleNameRisk passesPractical note
EXWEx WorksAt the seller's premisesBuyer arranges everything, including export formalities. Rarely convenient for a first international purchase.
FCAFree CarrierWhen handed to the buyer's carrierSeller clears for export. Practical for container and air shipments.
FOBFree On BoardWhen goods are on board the vesselSea and inland waterway only. Common for full container loads.
CFRCost and FreightOn board at originSeller pays main freight; risk still passes at origin. Insurance is the buyer's.
CIFCost, Insurance and FreightOn board at originAs CFR with minimum-cover insurance arranged by the seller. Sea transport only.
CPTCarriage Paid ToWhen handed to the first carrierAny transport mode. Seller pays carriage to the named destination.
CIPCarriage and Insurance Paid ToWhen handed to the first carrierAs CPT with higher-level insurance cover by the seller.
DAPDelivered At PlaceOn arrival, ready for unloadingImport clearance and duties remain with the buyer. Widely used for project supply.
DPUDelivered at Place UnloadedAfter unloading at the named placeThe only rule where the seller unloads.
DDPDelivered Duty PaidOn arrival, duties paidMaximum seller obligation, including import duties. Only viable where the seller can clear in the destination.
04Next step

Send the whole list — not only the lines you think we cover

Fill in the template that fits your requirement and send it as it is. Incomplete lines are raised as clarifications before sourcing rather than guessed.